Case History

CHORLTON HIGH SCHOOL, Greater Manchester

Following a complaint by teachers to Manchester City Council about over-heating and mugginess, Classvent was installed as a trial in one classroom.

Temperatures and CO2 levels were monitored and compared with those of an adjacent classroom in which the original natural ventilation system remained.

Classvent mechanical ventilation system was proven to hold CO2 levels below the stipulated 1,500ppm guideline levels. Data for the naturally-ventilated adjacent classroom were taken in August with the windows open. CO2 levels would rise even further in winter, with windows closed.

Following this trial, further schools in the area opted to install the system under the Manchester Building Schools for the Future initiative.


Back to Classvent

 
English

 

Contact


Gary Dawson

Business Manager
Switchboard
01962 873000
Direct Dial
01962 873059
Mobile
07801 684437
Fax
01962 873102
E-mail
buildingservices@iacl.co.uk
 


 

Downloads

Jason Saunders of IAC gives the manufacturers perspective on BB93

 


 

Related Pages

- Education
- Classvent
- Case History