For immediate
release
10 April 2006
IAC MAKES AN ENTRANCE AT THE NEW WEMBLEY STADIUM
Visitors passing through the famed Tunnel Entrance into the new Wembley Stadium will benefit from a custom IAC noise control solution.
The plant rooms for the chillers serving the Stadium’s main stands line the tunnel and noise emissions into the area will be attenuated through a bank of specially-designed IAC acoustic louvres and attenuators. The louvres and attenuators are of an energy saving, aerodynamic design, with low pressure drop characteristics. Of all metal construction they are designed for a long, trouble-free life.
Mike Jackson, Sales Manager said: "It’s great to be making a contribution to this exciting, high profile, national stadium project"
For more information on this project contact Mike Jackson on mikej@iacl.co.uk
ENDS
For further press information please contact: Sally Davis in the IAC Press Office on 023 9266 1600 m: 07802 436739 sally@theprdepartment.co.uk
This image is available to download in moments from the Photo Library on the main IAC website. Please click here to visit the Photo Library.
 |
| Press
images available in our Photo Library |
|
To
go back to the main News page Click
Here |
|